PT Total Movements transports transformer to Indonesia

Comments Off on PT Total Movements transports transformer to Indonesia

Project Logistics Alliance’s Indonesian member, PT Total Movements International, transported a 786MVA (323MT) model transformer and its accessories by multimodal means from Singapore to its foundation in Indonesia.

Total Movements’ execution involved the ship-to-barge transfer of the cargo at Singapore, rolling off the main unit at Tanjung Jati jetty, and transporting the entire consignment by road to the project site.

This project required lashing and securing the transformer, which weighed 323 metric tons on the barge. Also, a safe jacking and rolling of the cargo off the barge.

The challenging part of the project was that critical manoeuvres were required because the road route required multiple turns. Moreover, they had to route the cargo through uphill/downhill roads. A suitable technical study was also conducted to ensure the cargo’s safety.

The post PT Total Movements transports transformer to Indonesia appeared first on Project Cargo.

8 September 2022 |

Comments are closed.

Skip to toolbar